Scaling Telecom Infrastructure – Inside CellNet’s 573-Site Rollout
November 24, 2025

Connecting Communities at Scale

Rolling out hundreds of telecom sites is no small feat. For Zambia’s Zamtel GRZ Turnkey Rollout, CellNet delivered 573 sites nationwide, proving that disciplined processes and strong logistics can overcome terrain, weather, and supply chain challenges.

The TurnKey Aproach

CellNet’s model covers every stage:

  • Survey & Design – Site assessments and build packs
  • Civil Foundations & Tower Erection – Standardized templates for speed and quality
  • Electrical Installations – Reticulation, earthing, surge protection
  • RF/MW Commissioning – Integration and testing for “on-air” readiness
  • Audits & Documentation – Photo logs, earth resistance readings, and structured handovers

This repeatable sequence ensures predictable timelines and compliance.

Logistics: The Hidden Approach

Local fabrication and galvanization of steel components, generator housings, and material kits reduce delays and costs. Stage-wise material inflows keep crews productive and prevent idle time.

Safety and Quality at Scale

Certified teams follow strict Health, Environment & Safety (HES) standards, including climbing and electrical certifications, PPE compliance, and toolbox talks. QA/QC is enforced through inspection plans and documented evidence.

Why It Matters

For operators, the benefits are clear:

  • Faster time-to-service
  • Standardized documentation
  • Lower risk of rework for communities, it means reliable connectivity that supports education, commerce, and healthcare.
Scaling telecom infrastructure is possible without compromising quality—when process, people, and logistics work in harmony.

Related News